group logo

First Look: New Bathrooms Completed at River Forks Park

7:35 PM · Feb 20, 2020

The new bathrooms at River Forks park have been completed. The two facilities were both designed and built by Romtec, a local building manufacturer. The bathroom building located next to the large playground and main pavilion has 8 individual bathroom units, including two wheelchair accessible units. It also has drinking fountains on the side of the building. The building up by the upper playground and fort area has two individual bathroom units as well as a 24 foot long pavilion out at the front portion of the building. Both bathroom buildings look very nice and well constructed. Romtec did an excellent job and these bathrooms will be an excellent addition to the park. The new bathrooms should be open for public use starting this Saturday, February 22nd.

© 2024 Tracker LLCGive feedback
logo